In this project we replaced a number of double-glazed glass roof panels at the All England Tennis Club in Wimbledon, London SW19.

Project Detail

  • Duration: 7 Days
  • Location: Wimbledon, London SW19

Project Scope

  • Scaffolding
  • Template Existing Glass
  • Procure Replacement Panels
  • Fit and Seal Replacement Panels
  • Remove Scaffolding

Remarks

This was a glass roof over a staircase in the All England Tennis Club Millennium building. The roof was 5 stories high and required specialist scaffolding. The glass panels were an unusual shape and tint which we had to carefully match. The replacement panels were very heavy and took 3-men to install. We also had to comply with strict health and safety requirements.