In this project we installed replacement laminated fire resistant glass to a restaurant door at the All England Tennis Club in Wimbledon, London SW19.

Project Detail

  • Project Duration: 10 days
  • Location: Wimbledon, London SW19

Project Scope

  • Site survey for initial client estimate.
  • Specification and procurement of replacement laminated fire resistant glass.
  • Installation

Remarks

This project required very high specification 18mm fire resistant glass.