In this project we remodelled the front of this shop in Eltham, London SE9, by moving the existing site door to the front of the premises to increase footfall.

Project Detail

  • Project Duration: 2 days
  • Location: Eltham, London SE9

Project Scope

  • Site survey
  • Procurement of glass and subframe materials
  • Moved door from side to front of shop
  • Replaced old door subframe with new glass and subframe

Remarks

This project was one of many that we have completed for a chain of hairdressers that we support.