In this project we supplied and fitted a new composite door and subframe to this 1930’s home.
Project Detail
- Duration: 14 Days
- Location: Orpington, Kent BR5
Project Scope
- Site survey.
- Procurement of door and frame to client’s specification.
- Installation
Remarks
This was a composite door with a 5-point locking system and metal skin. This provides improved security.